I think it would be cool if we had a Natchez Trace 1000 Patch.
It is a challenging ride because the Natchez Trace Parkway is 444 miles long, the Park Service says it takes 10 hours to travel its full length.
That would leave you 14 hours to finish your remaining 556 miles which is doable but not easy.
I will be riding the Trace this Labor Day weekend to see how it goes, for sure I hope to turn it into a SS 1000 certified ride in the future, a patch would be a great plus.
Let me know what ya think.
It is a challenging ride because the Natchez Trace Parkway is 444 miles long, the Park Service says it takes 10 hours to travel its full length.
That would leave you 14 hours to finish your remaining 556 miles which is doable but not easy.
I will be riding the Trace this Labor Day weekend to see how it goes, for sure I hope to turn it into a SS 1000 certified ride in the future, a patch would be a great plus.
Let me know what ya think.